Another success for our Water Management team as a site with a high risk of surface water flooding gains approval from the Lead Local Flood Authority. Our mitigation scheme includes capturing and redirecting the overland water flow via earthworks and ditches to a new storage basin. From there, an existing culvert is improved and a new surface water culvert is provided alongside the access road to provide an alternative discharge route.